MEP engineering · Bali · since 2024

MEP engineering in Bali: no smoke in the dining room, no clashes on site

Kitchen exhaust with air balance, ventilation and air conditioning, electrical with spare capacity, water and drainage for restaurants, hotels and villa complexes. We model every system in Revit, install it with our own team and commission it until the kitchen runs clean at peak hour.

WhatsApp and calls: WhatsApp
Open-kitchen restaurant in Canggu with a stainless canopy exhaust hood over the grill line and clear air in the dining room
M-101Air balanceOpen kitchen
Kitchen exhaustMake-up airTransfer airKitchen − / dining + : smells stay in the kitchen
15+years of MEP practice behind our key engineers
16projects in Bali since 2024, from computer clubs to villa complexes
3systems in one team: HVAC, plumbing, electrical
0IDR for the site survey and the estimate
1Revit model where every duct, pipe and cable tray is checked before install
01G-000Why it matters

Engineering mistakes are paid for twice, correct design is paid once

A kitchen that smokes into the dining room, stuffy air, condensation on the ceiling and a difficult handover usually share one cause: systems drawn separately and fitted on site by trial and error.

10%

of contract value saved through clash detection on BIM projects, in a Stanford study of 32 major projects. Coordination is cheaper on screen than in a ceiling.

Source: CIFE data (32 BIM projects) as reported by Azhar, Hein & Sketo, 2008
61%

of fires in eating and drinking establishments involve cooking equipment. Hood design and a cleaning schedule are fire safety, not decoration.

Source: NFPA, Structure Fires in Eating and Drinking Establishments (Campbell, 2017)
5–7×

is how much more energy per square foot restaurants use than other commercial buildings. Oversized fans and systems that fight each other show up on the PLN bill every month.

Source: ENERGY STAR for Small Business: Restaurants (US EPA)
24 °C

is the typical dew point of Bali air, month after month. Any duct, pipe or ceiling colder than that collects water unless it is insulated and sealed.

Source: NOAA GSOD, Ngurah Rai 97230, 2015-2024: monthly mean dew point 22.4-24.6 °C
03C-001The team

Engineers from airports and power plants, now designing Bali kitchens

We are MEP engineers working in Bali since 2024. Before the island, our key people spent 15+ years on projects where an engineering mistake is not an option. Here we bring the same discipline to restaurants, HoReCa and apart-hotels: one model, one team and one person responsible for the result.

  • 15+ yrsof MEP practice behind the key engineers: HVAC, industrial ventilation, chilled water, water supply and treatment
  • Revitevery project is modelled in BIM; ducts, pipes and cable trays are coordinated in 3D before work starts
  • 1 teamdesign, installation, commissioning and service in one pair of hands, with no middlemen
  • Balikey specialists live here and come to site; we know what the tropics do to fans, ducts and insulation
MEP engineering team reviewing drawings at a restaurant site in Canggu

Before Bali our engineers worked on Domodedovo Airport Terminal 2, an oncology diagnostics centre, shopping centres and four nuclear power plants: Novovoronezh II, Belarusian, Rooppur and Kola.

04M-000Services

Every system a venue runs on, in one contract

Design in Revit, supply, installation, commissioning and maintenance. Take the full package or only the part you need.

05S-000Solutions gallery

What we build, system by system

Typical solutions for Bali venues. Every card has its own WhatsApp button, so you can ask about exactly that option.

Wood-fired pizza oven with its own stainless exhaust hood in an Ubud trattoria
Kitchen exhaust

Wood-fired oven with its own hood

Solid-fuel ovens get a dedicated hood and flue, separate from the rest of the line.

Wok burner line under a long wall canopy hood in a Jakarta restaurant kitchen
Kitchen exhaust

Wok line under a long wall hood

High-heat woks need generous overhang and airflow per metre; baffle filters catch the grease.

Centrifugal kitchen exhaust fan with a vertical discharge stack on a Seminyak rooftop
Kitchen exhaust

Roof fan with a vertical discharge

The plume goes up and away from neighbours and the make-up air intake; the fan stays serviceable.

Air-conditioning outdoor units in a neat row on the roof of an apart-hotel in Canggu
HVAC & fresh air

Rooftop outdoor units for many rooms

Outdoor units grouped on the roof with covered pipe trays, instead of a unit on every balcony.

Villa bedroom in Pererenan with a slim fresh-air diffuser and closed garden doors
HVAC & fresh air

Fresh air for closed villa bedrooms

Slim ceiling diffusers fed by a heat-recovery unit: fresh, drier air with the doors closed.

Technician opening an in-ground grease interceptor behind a Sanur restaurant
Water & drainage

In-ground grease interceptor

Sized for the kitchen flow and placed where the cleaning crew can reach it without closing service.

06M-102Calculator

How much air does your kitchen hood need? Calculate it in a minute

Enter the hood type, cooking line length, dining area and seats. Get exhaust, make-up and transfer air in m³/h, cooling capacity, a power estimate and an indicative budget, then send the result to our engineer in one tap.

Open the calculator →

Sample result: 3 m wall hood, heavy-duty line, 120 m² dining, 60 seats

Kitchen exhaust6,700 m³/h
Local make-up air in the kitchen≤ 4,000 m³/h
Transfer air from dining≥ 2,700 m³/h
Dining cooling load45–48 kW
Air conditioning, approx.17–19 PK
07G-100How we work

From survey to service, one responsible team

Eight steps. At each one you know what is being done, by whom and what it costs.

Free survey

An engineer visits the site or reviews your drawings, measures and lists what the venue needs.

Concept

System choices with budget ranges: where the air goes, how much power you need, what can be reused.

Revit design

All systems in one 3D model. Clashes are solved on screen; quantities come straight from the model.

Equipment selection

Hoods, fans, AC units, boards, pumps and filters sized from calculations, with service support on the island.

Installation

Our own crews install every system. No chain of subcontractors between the drawing and the ceiling.

Commissioning

Every mode is tested: full cooking line, full dining room, night mode. Airflows are measured and balanced.

Handover

As-built drawings, settings and test results you can show at the SLF inspection and hand to your operator.

Service

After launch we take the systems on maintenance: hoods and filters, air conditioning, electrical checks.

Payment is staged and tied to these steps; the schedule is written into the contract before work starts.

08Q-000Prices

Honest ranges before the first meeting

Indicative Bali prices for 2026. The exact figure comes after the free survey: two kitchens of the same size can need very different systems.

ItemIndicative range, IDRUnit
MEP design in Revit (BIM)
All systems coordinated, drawings, quantities
Rp 60–150 thousand *per m² of floor area
Kitchen exhaust, café
Hood up to 2 m, duct, fan, make-up air, balancing
Rp 10–25 million *per system
Kitchen exhaust, restaurant
Hood line 3-5 m, duct to roof, fans, make-up air, balancing
Rp 25–60 million *per system
Split air conditioner, installed
Unit, standard piping, installation
Rp 4.5–7.5 million *per PK
Grease trap SS304, installedRp 1.8–9 millionper unit, 50-300 L
Maintenance plan, restaurant or villaRp 1.5–5 millionper month

Indicative ranges in IDR. Scope, materials and access decide the final quote.

09G-300Typical problems we fix

Three calls we get every month, and what fixes them

Patterns we see in Bali venues. Most of them cost less to prevent in design than to repair after opening.

Smoke and smell reach the dining room

  • ProblemThe open kitchen smells up the hall at peak hour and guests ask for tables far from the pass.
  • CauseExhaust without planned make-up air: the hood pulls air from wherever it can, while the dining AC pushes back.
  • FixPlan the replacement air: part as gentle make-up air in the kitchen, the rest as transfer air from the hall, so the kitchen stays at slight negative pressure. Then commission at full cooking load.

Water drips from the ceiling

  • ProblemDark stains on the gypsum board near diffusers and droplets on ducts in the ceiling void.
  • CauseCold ducts and pipes without continuous vapour-sealed insulation, surrounded by humid air all year.
  • FixInsulate with a vapour barrier, seal every joint, check supply temperatures and fresh-air humidity. Fix the source, not the stain.

Breakers trip at 8 pm

  • ProblemEverything works in the afternoon; at dinner the main breaker or a kitchen circuit trips.
  • CauseLoads were added without a load calculation: extra AC units, a second oven, a dishwasher on the same circuit.
  • FixLoad audit, phase balancing, new circuits and a board with spare capacity, plus a PLN upgrade plan if the connection is the limit.
10R-000Projects

Where our systems already run, in Bali

A selection of our Bali projects since 2024. Ask on WhatsApp for drawings and calculations from a project like yours.

Simply Coffee

beauty salon
ventilation

Moon Lounge

lounge
ventilation

Optimist

restaurant
ventilationstainless steel interior structures

Kala

restaurant
ventilationstainless steel interior structures

Kolizeum

computer club
ventilationair conditioning

CUBE

computer club
ventilationair conditioningwater supply & drainage

Space Dragon Bali

office
ventilation

Chai-Chitai complex, Cemagi

hospitality complex
ventilationair conditioningdesign & installation
12F-000FAQ

Before you message us

If your question is not here, just ask it on WhatsApp.

Do you only design, or also install?

Both. We design in Revit, supply the equipment, install every system with our own team, commission it and then maintain it. You can also order design only or an audit of an existing system.

How much does a restaurant kitchen exhaust cost in Bali?

It depends on hood length, cooking type and the duct route to the roof. See the indicative ranges or run the exhaust calculator. The survey and the estimate are free.

Is the site survey really free?

Yes. On request an engineer visits the site or reviews your drawings and prepares a cost estimate at no charge.

Can you fix a system another contractor installed?

Yes. We start with measurements: airflows, pressures, temperatures, electrical loads. Then we propose the smallest change that solves the problem. See MEP audit.

Why design a small restaurant in Revit?

Because ducts, pipes and cable trays compete for the same ceiling. A 3D model shows clashes before they are built, and quantities come from the model, so the estimate is transparent. More in Revit design.

What happens after the launch?

We take the venue on service maintenance: hood and filter cleaning schedules, air conditioning service and electrical checks. See maintenance.

Do you work outside Bali?

Our key specialists are in Bali and most projects are here. Projects elsewhere in Indonesia are discussed case by case.

Do you service commercial HVAC as well as villa AC?

Yes — beyond villa split units we are an HVAC contractor for Bali restaurants, gyms and boutique hotels: ducted systems, VRF, cold rooms and kitchen exhaust, with maintenance contracts that keep compressors alive through tropical peak season.

13V-100Villa cooling

Villa air conditioning, asked the long way

The villa questions we answer on WhatsApp every week: high ceilings, light sleepers, VRF budgets and maintenance contracts.

A villa is not a hotel room scaled up. Vaulted ceilings of four to six metres hold a cushion of hot air above the living area, glass walls add solar load by the hour, and the bedroom has to stay silent at 2 am. So every villa project starts the same way: a cooling load calculation per room, then unit selection by air throw and sound data at low fan speed, not by brochure BTU.

And it continues after handover. One team designs and installs the system, the same team maintains it on a schedule, so a villa manager never has to explain a rattling condenser to a guest at midnight.

Which AC works in a villa with high ceilings?

With a 4–6 m vaulted ceiling the problem is stratification: cold air pools at floor level while the roof space stays hot. We size units from a room-by-room load calculation, pick indoor units by air throw so the jet actually reaches the seating area, and often pair them with ceiling fans that push the cold cushion back down.

What is the quietest AC setup for a villa bedroom in Bali?

Choose the indoor unit by its sound level at low fan speed, not by the cooling badge, and keep the condenser off the bedroom wall — on vibration mounts, out of the line of sight of the pillow. We also check the humidity side: an oversized unit cools fast, stops dehumidifying and the room feels clammy. More in our note on villa humidity.

VRF or split systems for a villa — which one?

For one or two bedrooms, individual splits win: cheaper, simpler, any technician can service them. From roughly six indoor units — a large villa or a villa complex — VRF starts to pay back: one condenser bank instead of a row of outdoor units, better part-load efficiency and central control. We put both options in one estimate so you compare them side by side.

Do you offer AC maintenance contracts for villa management?

Yes. A maintenance contract covers filter and coil cleaning, refrigerant and drain checks and a written log per unit, across a whole portfolio of villas. Guest complaints go to one WhatsApp line and are fixed before the checkout review is written.

Why does a villa feel clammy in the rainy season even with the AC running?

Because the unit is cooling but not dehumidifying. Bali air has a dew point near 24 °C all year, and from November to March the indoor load is mostly moisture. An oversized split cools the room fast, cycles off and leaves the humidity behind; a unit sized from a room-by-room load calculation runs longer at low speed and dries the air. Closed bedrooms also need fresh air that has been dried first, which is what a heat-recovery unit does. Send the room sizes and unit models on WhatsApp and we check both.

Updated 8 November 2026

Four things we check in Bali venues from November to March

The rainy season has started. Humidity, storms and power cuts find the weak points in a venue's systems; December and January add full dining rooms and full hotels.

  • Condensation on ducts and ceilings. Bali air sits at a dew point near 24 °C all year, and in the wet months the ceiling void is wetter still. Any cold duct or pipe without continuous vapour-sealed insulation drips; we check the insulation and the joints.
  • Roof fans and discharges. Exhaust fan housings and roof discharges are detailed so rain does not run back down the duct. On an existing system we check it before the storms do.
  • Make-up air humidity. Raw outdoor make-up air makes a hot kitchen sticky; transfer air from the air-conditioned dining room arrives cooled and dried. The split is checked at full cooking load with the dining AC on.
  • Boards and spare capacity. Thunderstorms and PLN outages are the season's test for distribution boards. A load audit before the December peak shows which circuits trip at 8 pm and why.

Send photos of the hood, the roof and the main board, or a short video from the pass at peak hour, on WhatsApp. The survey and the estimate are free; existing systems go on a maintenance plan with hood and filter cleaning, AC service and electrical checks before the holiday weeks.

Tell us about your project

Describe the task, we answer on WhatsApp

Two ways to reach an engineer. Either one lands in the same WhatsApp chat.

Write it in your own words

A new restaurant, a kitchen that smokes, a hotel that needs air conditioning, a villa complex at design stage: a few lines are enough to start.

WhatsAppPrices