02A-02Hotels and apart-hotels

MEP for hotels and apart-hotels: quiet, dry rooms and systems that scale

Guests notice three things: noise, humidity and hot water. Owners notice the energy bill and the maintenance calls. We design room systems that are quiet and dry, central systems that scale, and a building that is easy to service.

  • Room cooling and fresh air with humidity under control
  • Split, VRF or chilled water compared for your building
  • Hot water and pumps sized for full occupancy
  • Revit design repeated across identical units
Air-conditioning outdoor units in a neat row on the roof of an apart-hotel in Canggu

Where hotels lose money on engineering

Complaints about noise and stuffiness cost reviews. Mould in closed rooms costs refurbishment. A system nobody can service costs callouts. And the energy bill of air conditioning runs every month for as long as the hotel exists. Each of these is fixed cheapest at design stage, when a duct route or a unit type is a line in a model, not a ceiling to cut.

The hotel brief

TopicWhat we design
Room coolingUnit type and size from room loads, low-noise selection, condensate that never drips
Fresh airVentilation per room; heat recovery where rooms stay closed
Central plantSplit, VRF or chilled water compared on cost, space and service
Hot waterGeneration and storage sized for full occupancy, circulation for fast delivery
Water and pumpsStorage, booster pumps and water treatment
PowerLoads per floor, spare capacity for kitchens and future units
Kitchen and barExhaust with air balance if the hotel has a restaurant

For apart-hotels the key decision is often split versus VRF. We compare them in air conditioning for apart-hotels.

Hotel at design stage?

Send the architectural drawings. We come back with system options for your building and a first budget.

Design once, repeat correctly

Apart-hotels repeat the same unit many times. A mistake in one unit becomes a mistake in all of them, and a good detail pays off in every one. That is why we model the typical unit in Revit first, check it for clashes and service access, and only then repeat it. For One Uluwatu hotel our scope was Revit design; at Anta Residence Canggu we delivered MEP consulting, ventilation, air conditioning, water supply and water treatment.

After opening

Hotels run all year. We take systems on maintenance with a schedule for filters, AC units, pumps and boards, so guests do not become the fault-detection system.

Our projects in Bali

Our hospitality and residential projects in Bali

Chai-Chitai complex, Cemagi

hospitality complex
ventilationair conditioningdesign & installation

Hidden City Ubud

residential complex
ventilation with heat recovery

Anta Residence Canggu

residential complex
MEP consultingventilationair conditioningwater supply & drainagewater treatment

One Uluwatu

hotel
Revit design

ZEN Luxury Complex

hospitality complex
ventilationair conditioning
Questions

Questions owners ask us

Split or VRF for an apart-hotel?

It depends on the number of units, facade and roof space and how the hotel will be operated. We compare both in the design.

How do you prevent mould in hotel rooms?

Fresh air with humidity control, insulated cold surfaces and condensate that drains properly; see humidity and heat recovery.

Can you work for the contractor or the operator?

Yes: for the owner, the developer, the general contractor or the operator.

Do you provide documents for SLF?

We provide the MEP drawings and test results the inspection asks for; see the SLF checklist.

Tell us about your project

Describe the task, we answer on WhatsApp

Two ways to reach an engineer. Either one lands in the same WhatsApp chat.

Write it in your own words

A new restaurant, a kitchen that smokes, a hotel that needs air conditioning, a villa complex at design stage: a few lines are enough to start.

Or fill in the short form

The form opens WhatsApp with your answers filled in.
WhatsAppPrices